SP26 Standard Cast Wired glass has been chosen for the 5 levels of the Rotunda and Stair cores of Maidenhead Retail Centre.
ROTUNDA
A Sandblast finish has been applied on the internal surface to mask the visual impact of the building insulation.
STAIR CORES
The glass was installed in a single layer at upper levels to form a rain screen cladding. All areas accessible to the public are double glazed with profiled pressings provided at all levels.
Location: Maidenhead, London
Contractor: HBG
Architects: Chetwoods Associates
Photographer: Simon Warren